Skip to main content

Challenger 601-3R  Serial 5191

Taking Offers

Aircraft

  • Manufacture:  Bombardier
  • Serial No:  5191
  • Total Time:  4565 Total Landings:  2070  

Engines

  • Serial No.'s:  Left - 807347 and Right - 807348
  • Total Time:  4565 (both)

 APU

  • Total Time:  2450
  • Maintenance Plan:  MSP

Avionics

  • Auto Pilot/Flight Director: Dual Honeywell SPZ-8000, Dual Larzeref 3 IRUs (Provisions for 3rd IRU)
  • FMS:  Dual Honeywell NZ-2000, software ver 5.2, Dual CDU-810, Dual CDU-810
  • Dual GPS sensors
  • RVSM:  Yes
  • COMMs:  Honeywell Primus II w/8.33kz spacing
  • NAVs:  Honeywell Primus II w/FM immunity
  • Transponders:  Honeywell Primus II, mode S diversity w/flight ID
  • ADFs:  Honeywell Primus II
  • DMEs:  Honeywell Primus II
  • Audio:  Honeywell Primus II, AV-850A
  • TCAS:  L3 TCAS II, TCZ-910 w/Change 7
  • Terrain:  Honeywell EGPWS MK V
  • Weather Radar:  Honewell WU-880 w/lightning sensor
  • Flight Data Recorder:  Fairchild F-1000
  • Cockpit Voice Recorder:  Fairchild A100A
  • AFIS:  Honeywell VHF/Sat-comm/Global Data Center
  • Electronic Checklist:  Heads Up CMS-400 voice system
  • Misc:  ELT 406MHZ, Lighted approach plate holders, Dual Davtron M877 clocks.

Cabin

  • Seating:  10 place normal or 12 place with second divan installed
  • Glley:    Forward w/convection oven; microwave oven; coffee maker; large cold storage; separate clean ice drawer; jump seat.
  • LAV:  Aft LAV, 10 gallon water system
  • Phone System:  Aircell system, 3 lines (1 is dual Aircell/Iridium), conference calling capability. Cabin Information System:  Airshow Genisses w/briefer
  • Entertainment:  DVD 6 disk changer with 2 screens 14" & 15"; CD player w/10 disk changer; Full rnage speaker system w/subwoofer.
  • Emergency Equipment:  14 each life vests, 2 each 12 man rafts.

Maintenance

  • Tracking Program:  CIMMS, (enrolled in from date of manufacture)
  • Parts Program:  SMART Parts with Honeywell supplemental avionics coverage
  • Upcoming:  6, 12, 24, 60 and 120 month inspection and gear overhaul in progress

New paint August 2004 and new partial interior August 2004 - carpet, seat foam, divans, sidewalls and bulkheads, entry curtain, galley floor runner, crew seats, entry steps, and pillows/thows.  New headliner 2/2006.